May 9, 2013
Installation of a new livestock building to increase productivity New silage clamps, New milking parlour, New access roads New Livestock building.
May 9, 2013
Upgrade of an existing cattle farm to increase productivity including, Foundation and bolt box installation, Holding gate post installations Drainage upgrade and installation Surfacing of through roads Concrete beds and scrapper channels New precast concrete dividing walls.
April 12, 2013
LRD provided the plant, labour and materials required to dig out and construct this muck hole. The insitu cast concrete walls are 4m tall and 200mm wide, steel reinforced and tied to the concrete ground slab with a concrete access ramp at one end and an outflow U-connection at the other.