Installation of a new livestock building to increase productivity New silage clamps, New milking parlour, New access roads New Livestock building.

Upgrade of an existing cattle farm to increase productivity including, Foundation and bolt box installation, Holding gate post installations Drainage upgrade and installation Surfacing of through roads Concrete beds and scrapper channels New precast concrete dividing walls.

LRD provided the plant, labour and materials required to dig out and construct this muck hole. The insitu cast concrete walls are 4m tall and 200mm wide, steel reinforced and tied to the concrete ground slab with a concrete access ramp at one end and an outflow U-connection at the other.

LRD have recently completed a 17,000m2 retail development for Mace Construction on the old Churnet Works industrial estate in Leek. The project consisted of 3 Industrial units, external yard areas and a new 5,300m2 Sainsburys super store. We have aslo secured the contract for the 3 future retail units also to be built at the […]

Preparation work for a farm in Fulford. The project is a concrete base for pig sheds.

Copyright © 2013   |   Top